ISONEM POOL
I NEED MORE INFORMATION
4 + 1

ISONEM POOL

Polyurethane Based, 2 Components Pool Paint

ISONEM POOL is the swimming pool paint which is based on polyurethane resin, consisting of two components, blue in color. It is not affected by water and water pressure. ISONEM POOL is particularly very ideal to use in swimming pools which are new made, decorative pools in the cases where the ceramic covering will not use. It gives a homogeneous blue appearance on the surface applied. It is elastic, not crack, it is not affected by the UV lights and the swimming pool chemicals. The product has high resistance against alkali and chloride. Its color does not fade in time, not destroyed underwater, abrasion-proofing. The workmanship is very easy and economic.
 
TECHNICAL SPECIFICATIONS
· Type : Polyurethane resin based, solvent based, two-component
· Color : Blue
· Flash point : > 21°C
· Solids (%) : 67 ± 2
· Density (25°C, g/mL) : 1.25 ± 0.1 gr / ml
· Pot life (20°C) : 5 - 6 hours 
Documents of the ProductDocuments of the Product
Usage AreasUsage Areas
· In pools, water tanks, water tanks,
· In metal tanks and water cisterns,
· In ornamental ponds, ponds, dams, water channels,
· In the treatment and balance tanks,
· On concrete, plaster, and screed.
Application TypeApplication Type
Surface Preparation : The surface to be coated must be clean, dry and all impurities that can affect the adhesion like dirt, oil, loose paint or foreign material must be cleaned. Surface repairs, cracks and gaps should be repaired with ISONEM M 03 Elastic Repair Mortar. Before the ISONEM POOL application, concrete and plaster coated surfaces should be primed with ISONEM EP PRIMER (Solvent-free epoxy based primer) with consumption of 0,25 – 0,4 kg/m².Preparation of the mixing : To prepare ISONEM POOL for use, first stir the contents of the A Component (Paint) and then add the contents of the B Component (Hardener) and mix homogeneously for 4 minutes to ensure thorough mixing.
 
Application Method : It should be applied with a brush, roller or appropriate spray and left to dry.The second layer should be applied after the first coat is dried, in 24 hours. The prepared mixture should be consumed in 5 - 6 hours time. After the application, the pool should be left to curing 10 days, before filling water.
Consumption and Suggestions
CONSUMPTION : Approximately 1 kg/m² (2 layers) 4,5 – 5 m²/1 tin box.
PACKING : 4,5 kg set (A Component: 4 kg canister (paint) + B component: 0,5 kg
canister (hardener)
STORAGE : 24 months in original, unopened package, cool and dry environment.
 
Application Photos
ISONEM POOL Application Photos
ISONEM POOL Application Photos
ISONEM POOL Application Photos
ISONEM POOL Application Photos
ISONEM POOL Application Photos
ISONEM POOL Application Photos
ISONEM POOL Application Photos
ISONEM POOL Application Photos
ISONEM POOL Application Photos
ISONEM POOL Application Photos
ISONEM POOL Application Photos
Share this product: